Simulazione · Minimal Logistik · Road, air and distribution
Leipzig/Halle · air cargo hub
A night hub for air cargo as a walkable model: about 60 freighters a night on the 3,600-m south runway, the apron, the sorting halls and the A14 at the Schkeuditz interchange.
Real are the location, terrain and buildings (open elevation data, OpenStreetMap) and the site profile figures. Volumes, rhythms and vehicle numbers are model assumptions; stands are schematic. With your data, the model also shows landings per hour, ground times and trucks per gate.
The Leipzig/Halle air cargo hub as a running model: about 60 freighters a night land on the 3,600-m south runway, taxi to the apron and take off again. Each aircraft is unloaded, sorted and reloaded in just over an hour, and tug trains bring the cargo into the sorting halls.
There the cargo is sorted by destination, and trucks collect the shipments on the landside. To the north runs the A14 at the Schkeuditz interchange, where traffic backs up when demand exceeds capacity. In the model, 72 % of the node’s volume goes by road, and the rhythm of landings follows the node’s freight on the map. The supply chain ‘Air cargo Leipzig/Halle’ follows an urgent spare part from Nuremberg: by truck on the A9, sorted, on board in an air cargo container, with the customer in Europe by morning. Snow, ice or a motorway closure show how closely night freight and road are linked.
Real are the location, terrain and buildings, taken from open elevation data and OpenStreetMap, and the figures in the site profile, taken from public information. Daily volumes, rhythms and vehicle numbers are model assumptions in the right order of magnitude, the number of stands is schematic, and processes run accelerated. This page is for airport and hub operations, air cargo logistics, the region and economic development, chambers, schools and universities.
A freighter at night (riding along, key F)
- 01
on approach
- 02
rolling out after landing
- 03
taxiing to the stand
- 04
at the stand: being unloaded and loaded
- 05
pushback, taxiing to the runway
- 06
taking off
What is shown – why – for whom
| Cosa viene mostrato | Perché | Per chi |
|---|---|---|
| Apron: about 60 freighters a night, turnaround in just over an hour | PerchéShows the rhythm of the hub. | Per chiHub operations, teaching |
| South runway 08R/26L, 3,600 m | PerchéShows how the landing rate follows the freight. | Per chiPlanning, universities |
| Sorting halls with sorting by destination | PerchéExplains the work on the ground. | Per chiOnboarding, air cargo logistics |
| A14 at the Schkeuditz interchange with tailback | PerchéShows the dependence on the road. | Per chiRegion, transport planning |
| Riding along with a freighter | PerchéExplains every step in one line. | Per chiSchools, exhibitions |
| Supply chain ‘Air cargo Leipzig/Halle’ | PerchéFollows a spare part overnight. | Per chiEconomic development, public relations |
| Snow, ice and motorway closure | PerchéShow how closely night freight and road are linked. | Per chiHub operations, associations |
Facilities and areas in the model
-
Hub apron
Around 60 freighters land and take off at the hub each night; each is unloaded, sorted and reloaded in little more than an hour (accelerated here). Number of stands schematic.
-
South runway 08R/26L
3,600 m runway. Here landings and take-offs face east; their rate follows the node’s freight on the map (model).
-
Sorting halls
Inside the halls cargo is sorted by destination; on the landside trucks collect the shipments.
-
A14 near the Schkeuditz interchange
Ahead of the junction with the A9 traffic backs up when demand exceeds capacity. Utilisation as on the map (model).
Processes in the model
A freighter at night (riding along, key F)
- 01on approach
- 02rolling out after landing
- 03taxiing to the stand
- 04at the stand: being unloaded and loaded
- 05pushback, taxiing to the runway
- 06taking off
A truck at the gate (riding along, key F)
- 01driving to the gate
- 02check-in at the gate
- 03driving to the loading point
- 04being loaded
- 05leaving
Traffic at the bottleneck (riding along, key F)
- 01driving
- 02stuck in a jam
- 03the tailback slowly clears from its end (model)
Supply chain ‘Air cargo Leipzig/Halle’ (passes through this site)
- 01An urgent spare part from Nuremberg has to reach a customer in Europe by tomorrow morning
- 02By truck north on the A9 to the Leipzig/Halle air cargo hub
- 03At the Schkeuditz interchange: a jam makes it tight – the freighters leave on schedule
- 04In the sorting halls the shipment is sorted by destination and packed into an air cargo container
- 05On the apron: tug trains bring the containers to the aircraft, which is loaded through its door
- 06Take-off into the night – by morning the part is with the customer. The chain is an example (model)
Try the scenario ‘Winter chaos’
- 01tap it in the deck
- 02vehicles, yards and traffic-light rings at the site react at once
- 03time 4× shows how it develops
- 04‘Back to today’
How a cargo airport can use the model
-
Operations and planning
The freighters leave on schedule, even when the truck is stuck in traffic. The model shows when a shipment gets tight at the Schkeuditz interchange.
Per chiHub operations, planning, air cargo logistics
-
Onboarding and training
Ride along with key F: a freighter from approach via the stand to take-off, a truck from the gate to the loading point, a vehicle in the tailback. One line says what is happening.
Per chiNew staff, airport trainees
-
Local authorities and economic development
The supply chain shows step by step how an urgent spare part reaches a customer in Europe overnight – and what the hub does for the region.
Per chiRegion, economic development, chambers
-
Schools, universities, museums
How does a night hub for air cargo work? Landing, apron, hall and take-off stand in one sequence – also as a demo without anyone at the controls.
Per chiSchools, universities, museums and exhibitions
-
Public communication
The ‘Winter chaos’ scenario brings snow and ice: roads lose up to a third of their capacity and the Schkeuditz interchange bottleneck runs above 100 %. Four times the speed shows how it develops, and one tap brings back today.
Per chiPublic relations, associations
What you can change
Controls
- Economy: How much is produced and traded overall. Acts on all flows of Leipzig/Halle.
- Consumer demand: Container goods and food for retail. Weight here about 56 % of the volume.
- Industrial output: Raw materials, steel, parts, chemicals. Weight here about 44 % of the volume.
- Transport cost / tolls: Expensive roads shift freight to rail and water. Here 72 % of the volume goes by road.
- Season: Spring: more building materials and seed, raw materials +8 %, food +5 %. Autumn: harvest (food +18 %), Christmas run-up (containers +8 %), first heating oil deliveries. Winter: heating oil and Christmas trade, less road capacity.
Disruptions
- Disruption: Motorway (hits this site hardest): One lane remains, the detour loads the neighbouring routes.
- Disruption: Rail strike: Freight trains stand still, trucks and ships take over part, stocks pile up.
- Extreme weather: Snow and ice (hits this site hardest): Bottlenecks overloaded, canals partly frozen.
What the model gives a cargo airport
-
01
The hub in rhythm
Landing, handling, take-off: the model shows the rhythm of the freighters on the real site, station by station.
-
02
Air and road together
In the model, 72 % of the node’s volume goes by road. You see why a jam at the Schkeuditz interchange hits night freight.
-
03
Disruptions without damage
Motorway closure, snow and ice hit this site hardest. Trigger them, then return to today.
-
04
Site and map in one model
The landing rate follows the node’s freight on the Germany map, shown with live values in the site profile.
-
05
For visits and big screens
Runs in the browser and on large projections, with a demo that starts without anyone at the controls.
Your hub as a model
Would you like to see your apron, halls or landside like this? Write or call us and we'll work out which flight, shipment and truck data the model needs. The password is available on request.
cube4tec.de/spiele/minimal-logistik/
Chiedere informazioni
Minimal Logistik: Leipzig/Halle · Luftfrachtdrehkreuz
Basis and limits
Real are the location, terrain and buildings of Leipzig/Halle (open elevation data and OpenStreetMap) and the figures in the site profile, taken from public information. Daily volumes, rhythms and vehicle numbers are model assumptions in the right order of magnitude; processes run accelerated.
Public sources the model is based on:
- OpenStreetMap contributors: map data (ODbL 1.0)
- OpenFreeMap / OpenMapTiles: vector tiles
- Terrain Tiles, AWS Open Data (Terrarium)
- Trade press: air cargo volume at Leipzig/Halle
- Trade press: Central German airports – traffic figures 2024
- Federal Statistical Office: freight transport by mode
- German Environment Agency: freight emission data 2024 (g CO₂e per tonne-kilometre)
More places in the model
-
Frankfurt interchange (A3/A5)
One of Europe’s busiest motorway interchanges as a walkable model: the A3 and A5 cross, the weaving section becomes the bottleneck, and the tailback grows with freight, holidays or snow.
-
Großbeeren · freight village Berlin South
The freight village on the Berlin ring as a walkable model: distribution centres for retail and food, an intermodal terminal for goods from Hamburg, and the expressway the capital’s supply depends on.
-
Lehrte · MegaHub
A train-to-train transfer facility as a walkable model: six tracks of 720 m each, three gantry cranes, driverless transporters – and freight trains regrouped without shunting.
-
Germany · freight flows and nodes
All of Germany as a map of blocks: 27 nodes, 55 freight flows as bands of light, eleven bottlenecks with traffic lights. Controls, seasons, disruptions and ten scenarios change every flow at once, compared with today.
-
Hamburg · Container Terminal Altenwerder
An automated container terminal as a walkable model: up to 14 container gantries, driverless transport vehicles, the block yard, a rail station for trains up to 740 m and the truck gate.
-
Bremerhaven · car terminal and river quay
Bremerhaven as a walkable model: almost five kilometres of river quay for the largest container ships, straddle carriers, car trains and parking for about 95,000 vehicles at the mouth of the Weser.
-
Wilhelmshaven · JadeWeserPort and LNG terminal
Germany’s only deep-water port as a walkable model: the container quay on the Jade with straddle carriers and rail, plus the floating LNG terminal, a tank farm and the crude-oil pipeline to the refineries.
-
Duisburg · logport I (Rheinhausen)
A trimodal inland port on the Rhine as a walkable model: Rhine barges with sea containers from Rotterdam, gantries and yard, trains to the south, Eastern Europe and Asia, trucks into the region.
Real are the location, terrain and buildings (open elevation data, OpenStreetMap) and the site profile figures. Volumes, rhythms and vehicle numbers are model assumptions; stands are schematic. With your data, the model also shows landings per hour, ground times and trucks per gate.