シミュレーション · Minimal Energy · Coal and nuclear
Datteln 4
Germany’s newest hard-coal plant as a walkable model: coal by ship on the Dortmund-Ems Canal, power for the grid and the railway, district heat as far as Recklinghausen.
Real are terrain and buildings (Geobasis NRW, OpenStreetMap) and the power plants with capacity and years. Ship traffic, berth, conveyor, traction power and district heating routes are schematic; the old plant is estimated by position and years of dismantling; output now and CO₂ come from the model. With your data it shows more, such as real schedules, heat demand per neighbourhood or coal ship arrivals.
Datteln 4 as a simulation: Germany’s newest hard-coal plant has delivered 1,052 MW net since 30 May 2020, built from 2007 and delayed for years by court cases. It has three customers: about 640 MW go to the power grid, 413 MW to the railway as traction current, plus up to 380 MW of district heat for Recklinghausen.
The chain of the place: imported coal arrives by ship on the Dortmund-Ems Canal, a conveyor brings it from the harbour to the boiler house, and steam rises from the 180 m cooling tower. The traction power converter turns three-phase power at 50 Hz into 16.7 Hz traction current for the 110 kV rail grid. The waste heat flows through about 11 km of pipe to Recklinghausen, heat for some 100,000 households.
Next to it lies the old site of Datteln 1–3, with units from 1964, 1965 and 1969 that ran until February 2014, supplied traction current to the end and have since been demolished. The event ‘Switch off Datteln 4’ plays a winter evening in the 2022 gas crisis: coal plants run flat out to save gas – then Datteln 4 goes offline and the top shows who steps in. For operators, municipalities, chambers, schools, universities and museums.
The chain of the place
- 01
Delivery: Imported coal arrives by ship on the Dortmund-Ems Canal.
- 02
Conveying: A conveyor brings it from the harbour to the boiler house.
- 03
Burning: Datteln 4 burns it: 1,052 MW of power, steam from the 180 m cooling tower.
- 04
Traction power: Part of it goes to the railway as 16.7 Hz traction power.
- 05
District heat: The waste heat warms homes as far as Recklinghausen via district heating.
- 06
The old plant: The old units 1–3 ran until 2014 and have since been demolished.
What is shown – why – for whom
| 表示内容 | なぜ | 対象 |
|---|---|---|
| The chain Delivery – Conveying – Burning – Traction power – District heat – The old plant | なぜshows the path of the coal and the three customers | 対象Schools, visitors |
| Event ‘Switch off Datteln 4’ | なぜshows who steps in on a winter evening in 2022 when the plant is missing | 対象Grid planning, policymakers |
| Diagram ‘Who supplies first’ | なぜshows in which order the plants step in by cost | 対象Energy industry, universities |
| Diagram ‘CO₂ since 1990’ | なぜshows the CO₂ emissions of power generation per year and per kilowatt hour | 対象Climate protection, public relations |
| Diagram ‘Capacity and output’ | なぜsets installed capacity against generated output by source | 対象Associations, planning |
| Diagram ‘Every plant from construction to demolition’ | なぜshows Datteln 1–3 and Datteln 4 with operation, standstill and dismantling | 対象Museums, communications |
| Heat view on a winter evening | なぜshows the houses as a thermal image and the heat taken from the plant | 対象Municipalities, heat planning |
Facilities and areas in the model
-
Kraftwerk Datteln 4
1,052 MW net since 30 May 2020, built from 2007 and delayed for years by court cases. About 640 MW go to the grid, 413 MW as traction current, plus up to 380 MW of district heat.
-
Kraftwerk Datteln 1–3
Three units with about 300 MW in total from 1964, 1965 and 1969, shut down in February 2014. To the end they also supplied traction current.
-
Schaltanlage 380 kV
Here the three-phase power (50 Hz) enters the transmission grid.
-
Bahnstromumrichter
Converts up to 413 MW into 16.7 Hz traction current for the 110 kV rail grid. A converter station went into service in February 2014, when the old units went offline; that it is this one is assumed.
-
Bahnstrom-Schaltwerk Datteln
Hand-over into the railway's traction power grid.
-
Fernwärme nach Recklinghausen
About 11 km of pipe to Recklinghausen, heat for some 100,000 households. Route schematic.
Processes in the model
The chain of the place
- 01Delivery: Imported coal arrives by ship on the Dortmund-Ems Canal.
- 02Conveying: A conveyor brings it from the harbour to the boiler house.
- 03Burning: Datteln 4 burns it: 1,052 MW of power, steam from the 180 m cooling tower.
- 04Traction power: Part of it goes to the railway as 16.7 Hz traction power.
- 05District heat: The waste heat warms homes as far as Recklinghausen via district heating.
- 06The old plant: The old units 1–3 ran until 2014 and have since been demolished.
One day
- 01“Play the day”
- 02the sun moves, wind and demand change every hour
- 03the stacks above the plants grow and shrink
- 04storage charges and discharges
Fifty years
- 01▶ at the year (time travel)
- 021975
- 032000
- 042016
- 052025
- 06plants appear, run, are shut down and dismantled; the history of the place jumps to every year
Intervene
- 01tap Kraftwerk Datteln
- 02“Switch off”
- 03the top shows who steps in
- 04back with “All on again”
How a power plant site can use the model
-
Operations and planning
One plant, three customers: grid, railway and district heat on one site, with switchgear, traction power converter and the pipe to Recklinghausen. A plant’s card names capacity, years, state and the value now.
対象Operators, power plant and grid planning
-
Municipality and heat
Heat for some 100,000 households through about 11 km of pipe: the heat view on a winter evening shows the houses as a thermal image – a basis for talks about district heating and the coal exit.
対象Municipalities, heat planning, economic development, chambers
-
Schools and universities
Where does the railway get its power from? The steps of ‘How it works’ lead from the coal ship via conveyor and boiler to the converter that turns 50 Hz three-phase power into 16.7 Hz traction current.
対象Teachers, vocational schools, electrical engineering students
-
Museums and exhibitions
Time travel shows 1975, 2000, 2016 and 2025: first units 1–3, by 2016 they are out of service, in 2025 Datteln 4 runs with district heat to Recklinghausen. The history of the place jumps to every year.
対象Museums, industrial heritage, exhibitions
-
Public communication
Why did the coal plants run at full load in 2022? The event ‘Switch off Datteln 4’ plays the winter evening in the gas crisis – and shows who steps in when the steam disappears.
対象Public relations, policymakers, associations
What you can change
Controls
- Year 1975–2025: plants appear and disappear, mix and grid change; ▶ lets the years run.
- Season: snow, foliage, meadows, chimney smoke; more heat and power demand in winter, more sun in summer.
- Time of day: sun position, dusk, night with windows and street lights; demand follows the daily profile.
- Wind: rotors turn faster, sea state, smoke plumes lie flat; wind power rises, curtailment in a storm.
- Sun: clouds and soft shadows; photovoltaics deliver more or less.
- Demand (households, industry): more lit windows, plant lighting, chimney smoke; more expensive plants step in.
- Views: power, heat, fuels, storage, CO₂ – each with its own columns, stacks and values.
Events
- Switch off Datteln 4: Winter evening 2022 during the gas crisis: coal plants run flat out to save gas. In a moment Datteln 4 is switched off. With “Switch off” in any power plant card you can intervene yourself. Look for: the steam disappears; the top shows who steps in.
- Winter evening without wind or sun (tiles): Season winter, evening, calm, overcast: demand peaks, the stacks above wind and solar shrink, fossil plants, storage and imports carry the load.
- Stormy night (tiles): Night, gale, low demand: wind delivers more than is needed, storage charges, surplus is curtailed or exported.
- Switch off: Kraftwerk Datteln: The model calculates without this plant; the top shows who steps in, CO₂ and imports change.
What the model gives a power plant site
-
01
A plant with its surroundings
Canal, harbour, conveyor, boiler house, cooling tower, switchgear and traction power on one site in 3D, from high above down to eye level with cars, lorries and trains.
-
02
Switch off yourself
Tap Kraftwerk Datteln, ‘Switch off’: the model calculates without the plant, the top shows who steps in, CO₂ and imports change. ‘All on again’ takes you back.
-
03
Power now above the plant
Above Datteln 4 stands a stack of cubes, one cube 20 MW, the frame the installed capacity. In the stormy night and on the winter evening without wind or sun you see how it changes.
-
04
Five views
Power, heat, fuels, storage and CO₂: in the fuels view the world turns grey and the coal glows in its colour, and the CO₂ view names the emissions now in tonnes per hour.
-
05
In the browser and on the big screen
A browser is enough, and large projections work too. Eleven more places and the map of Germany are part of the same model, designed by an artist and developer.
Your power plant as a model
Would you like to show your power plant with grid, traction power or district heat this way, with real schedules and customers? Write to us or give us a call, and we will discuss which data the model needs. We will send you the password to the simulation on request.
cube4tec.de/spiele/minimal-energy/
この件について問い合わせる
Minimal Energy: Datteln 4
Basis and limits
Real are terrain and buildings (Geobasis NRW, OpenStreetMap) and the power plants with capacity and years. Ship traffic, berth, conveyor, traction power and district heating routes are schematic; the old plant is estimated by position and years of dismantling.
Public sources the model is based on:
- Geobasis NRW (dl-de/zero-2.0)
- OpenStreetMap-Mitwirkende (ODbL)
- OPSD; Wikipedia: Kraftwerk Datteln / Ausstieg Kohleverstromung (sekundär)
More places in the model
-
Hamm-Uentrop
Five decades of energy on the Lippe and the canal as a walkable model: the THTR-300 thorium reactor, the Westfalen hard-coal plant, a gas plant, a large battery – and soon direct current from Wilhelmshaven.
-
Wilhelmshaven
Germany’s only deep-water port as a walkable model: crude oil for the pipeline to the Rhineland, coal for two power plants and, since December 2022, liquefied natural gas from Germany’s first LNG terminal.
-
Rhineland lignite district
The Rhineland lignite district as a walkable model: from the Garzweiler mine via conveyors, boilers and cooling towers into the 380 kV grid – while wind, sun and batteries grow on the reclaimed land.
-
Düsseldorf Lausward
A combined-cycle gas plant on the Rhine as a walkable model: power to the grid, heat via a 58 m storage tank and the district heating line into the media harbour and the city centre.
-
Bochum · MARK 51°7
A former car plant above the Dannenbaum colliery as a walkable model: the new MARK 51°7 district is to draw heating and cooling from the water of the old mine, from 820 and 340 m down.
-
Lingen
The whole nuclear era in one place as a walkable model: the Lingen nuclear plant of 1968, the Emsland nuclear plant until April 2023, interim storage and dismantling – next to them gas, a battery and hydrogen.
-
Germany 1975–2025
Fifty years of energy supply on one map: 365 sites, ten grid regions and the power of every hour – from two separate grids in 1975 to wind and sun in 2025.
-
Herdecke
Three generations of storage at Lake Hengstey as a walkable model: the Koepchenwerk of 1930, the pumped-storage plant of 1989 and batteries since 2017 – the level in the reservoir follows sun, wind and demand.